Thursday, April 29, 2010

20th day

30 April 2010

a bad day.. wish i can b somewhere else wif my hummhumm :>
well, not much of task today.. i can say no task at all.. En Hishamudin left MGTC early in the morning.. meeting i guess.. so, i juz continue do summary of projects outcome, only this time i have to include the calculations together..:>

after lunch, work on coffee waste treatment project. :>

Finally, TGIF!!! :> :> :0

Wednesday, April 28, 2010

19th day

29 April 2010:>

Joined En Hishamudin meet with representatives from MPC(Malaysian Productivity Corporation).. En Hisham gave a brief explanation about day-lighting systems which relates to Energy Efficiency, and how it would save cost of electricity..:>
After a few minutes of questions and answer between En Hisham and them, En Hisham began his presentation bout Green Technology,.. among the things presented were the energy demand in Malaysia, GHG emissions, Efficiency & Conservation Programmes, code of practice(Guidelines for Malaysian Industries), Benchmarking(Audit and rating),
the MPC representatives also asked the cost of installation a solar panel for residential usage.. En Hisham said.. for 1kW solar(Photovoltaic) panel costs around RM23,000... and normally for a bungalow,it requires abour 4kW, around RM100k.. -sweat-
pretty much expensive huh.. and it took about 15years for the reburst of the investment.. En Hisham also briefly explained the National Green Technology Policy..:>



at 11am, the pre-GTC meeting began, .. lead TE (En Ismail) and some TE's, including GTFS and EISD staffs were involved,.. they discussed about the projects that they are convinced will succeed, to present them to the banks.. :>

at 1pm, we all had lunch in the cafeteria downstairs,.. menu: nasi ayam.. i sat together with En Haniff, Din, En Ismail, En Hishamudin and my intern colleague..
En Ismail shared his experiences when he went to Italy, Vietnam, and other places, describing how thrilled he is to see the engineer products there,.. we also discussed on some present cases and news.. :>

After lunch, really had nothing to do,.. kak ros invited me downstairs to have some kuih2 which are prepared for those staffs in the meeting.. still, we took some for ourselves :p..
also finished analyzing average and total counts of ratings on feedback forms..

18th day

28 April 2010,

Joined En Hishamudin to a seminar at UTM.. me, hafiz n him went by his car,.. we left MGTC at 8am... and reached there around 9am.. that includes following the smart tunnel,.. and En Hisham stoped his car by the sideroad to check his water level, and adjust the rpm meter.. reached the UTM,.. surprised by a building called 'rumah wangi'.. i tot it was a dumping area.. but my hummhumm told me its a room for spa.. yea rite huh :p.. :>
The seminar was actually kind of like a discussion.. with several speakers from different organizations, including UNIDO(United Nation Industries Development Organization), SME Corporation, and GEF.. and the main topic is "Improving Industrial Energy Efficiency in the Manufacturing Sector".. :>

and also, the new ISO 50001-Energy Management Standard.. which requires an organization to establish, implement, maintain and improve an energy management system, enabling systematic achievement of continual improvement in energy performance, energy efficiency, and energy conservation.:>
Here are some of the pictures i'm gonna share:

-Seminar introduction by someone-:>



-Ms Aimee McKane giving explanation about energy efficiency in industries-:>




-Sleepy Seminar environment(Dewan Jemaah)-:>



-En. Ismail explaining Green Technology Financing Scheme(GTFS)-:>




En Hishamudin invited us back at MGTC at around 240pm, right after En Ismail's presentation 'cuz we have a meeting scheduled at 330pm at MGTC... once we left UTM, En Hishamudin juz realized there is going to be a discussion among panels at the seminar, which I believe he was supposed to be involved... En Hishamudin texted En Ismail to represent him.. we reach MGTC around 345pm, and straight away went to one of the meeting room, waiting for other staffs.. the meeting discussed about preparation for pre-GTC meeting, MHGS project problems, screening report.. the meeting ended around 5.25pm.:>

:>my hummhumm is working late today... pity her :(

Tuesday, April 27, 2010

17th day

27 April 2010

Nothing much technical learnt today,.. juz assist kak ros with some photocopy and filing, rating from evaluation form, and assist my colleague photocopy and binding.:>
En Hishamudin asked me to come here at 745am in da morning tmr, invited me to join a seminar at UTM about energy management.. sounds cool, so i accepted d invitation :>

Wishing my hummhumm all d best since today is d first day she's fasting.. hang in there hummhumm.. kejap lagi buke lah tu.. :>

:>

Sunday, April 25, 2010

16th day

26 April 2010,

a great morning.. hopefully to a great new week.. reached work early as usual..
apparently, nth great things to do here today.. juz sit and read about photovoltaic and some projects.:>
One of the project i read today is about Implementing a new energy saving Heat Infrared(HIR) technology system in rubber glove manufacturing process for a new manufacturing plant..:>
HIR tech will be implemented on several rubber manufacturing lines with annual production capacity of 108.5 million rubber gloves per year with energy consumption of 308 MWh/year from only electricity source. The conventional technology currently in place for rubber glove manufacturing consumes 56% more energy for the same production. This new technology also increases productivity by 11%.:>

P/s: One great thing today is dat i can on messenger n chat wif mrs superman <3.

:>

Thursday, April 22, 2010

15th day

23 April 2010

Early in the morning, En hishamudin asked me to do a statistics of all companies, whether they have CDM(Clean Development Mechanism) or not.. he said En Zairin have a meeting this evening, and if possible, i need to finish and email it to him before solat jumaat. He asked me to ask En Haniff in how to determine whether the company has CDM or not.:>

I went down to GTFS operation room to find En Haniff, apparently, he's not here yet, so i decided to wait for him.. he showed up at 9.10am... and i told him about my new assignments, and his facial expression shows that it is a complicated and tiring works, as we had to analyze each companies' file to find the letter of approval about CDM.. En haniff was supposed to have a meeting with a client at 9 am, so he invited me to join the meeting.. the client is from Tokai Engineering (M) Sdn Bhd, and she needs En Haniff's help on completing the GTFS registration form.. she also asked for clarifications on the project outcome, calculations and all. En Haniff asked my help to do a conversion from diesels, to the amount of CO2 emmision.. luckily i brought my small notebook that i wrote down formulas in it.. the meeting took about an hour, and the client wish me luck for my training period..
Then, En Haniff and i continue on the assignment from En Hishamudin, took about 2 hours to complete it..:>

14th day

22 April 2010

Went to Bahau and Serting to visit a biomass power plant.. took lots of pictures, and some videos.. it was a fun, yet tiring and smelly experience.:>

The day started off as usual, I came in at 8.30 am, went to my workspace and do my usual routine;online, checking mails, fb etc.. then Haniff came and handed me the safety helmet.. quite rusty compared to my CIDB's one ... i decided to use the MGTC's helmet given.. journey starts at around 10.10am, and basically took about 2 hours to reach Bahau..once we reach there, we decided to have our lunch first, .. after that, we decided to visit the power plant at Serting, and visit the one in Bahau on our way back.. so we travel to Serting, and reached "Loji Biogas & Stesen Janakuasa Felda PALM Industries Sdn. Bhd. Kilang Sawit Serting Hilir" at around 1.30pm. :>

The powerplant at Serting is basically fed by water, which has already been extract from the EFB. The water is then stored, and processed to produce gas/steam, however, the steam produced also contains Methane, which pollutes the environment, hence the gas is directed to a system that processed the methane and use it to generate electricity... the tour took about 1hour..:>

After that, we went to the EFB biomass powerplant in Bahau.. they call it Project "Gajah Putih".. dunno why... the plant is no longer operating, as there are problems with the condenser, and boiler plates.. basically this plant is supposed to feed EFB into a shredder, which will make the EFB into smaller and more manageable size. then, it will be sent to Pressing machine, which will squeeze the EFB to extract oil and reduce the moisture content.the product is then sent to Envirocycler machine to burn the processed EFB and produce heat for HRSG. HRSG is a heat exchanger that recovers heat from a hot gas stream. It produces steam that can be used to drive a steam turbine. After undergo the HRSG, the steam will be piped to the Steam Turbine which extracts thermal energy from pressurized steam and converts it to useful mechanical works. It will then connected to 10 MW TNB grid.:>



<:Schematic Diagram of Biomass Power Generation Facility:>

Wednesday, April 21, 2010

13th day

21 April 2010,

Still getting used to the organization's new name (MGTC),.. not much task today.. juz continue studying projects and make a summary out of the outcome, i.e: Electricity consumption, CO2 reduction, fuel consumption, etc. :>

Read about HiWave facility to convert organic waste to high grade fertilizers & electricity for Malaysia. The project is about recycling the organic solid wastes originally landfilled or dumped which will continually lead to anaerobic conditions. The heart of the system incorporates the patented Aerobic Thermophilic Fermentation process, which isthe conversion of organic waste to organic fertilizers within 7 days.
The 7days period consists of 5 steps(functions); Aerobic Thermophilic Fermentation(ATF) process, Drying Process, Granulation Process, Sanitizing Process, Blending Process.:>
*Cant wait for weekend to come* :>

Tuesday, April 20, 2010

12th day

20th April 2010,

Another day at PTM(PTHN), i'm not feeling too good this morning, hving quite a headache tho.. luckily still cn access fbchat with my doc.. hate it dat i made her worried bout me.. but, chatting wif her really helps me tho :).. :>

Received a thank-you email from Ms Azaliza for the task i submitted to her yesterday.. later, she asked me to do some more statistics bout the projects, which involves the project management team.. so i do it immediately, took a while 'cuz i cant find one of the project file,.. after a few minutes, kak ros gave me dat file, which happens to be at her place, not in the GTFS operation room.. so i updated the data immediately and submitted it to Ms Azaliza.. she then forwarded my statistics to all GTFS staffs, and ask them to update the master list with it..:>

After that, i read on the slides about GEO(Green Energy Office) building from Mr Fendi.. he promised to show me PTM building's control room later in the evening..

here is an overhead view of PTM building:>














this is the cooling system diagram:















After lunch hour, Mr Zul gave me n my colleague a brief presentation about energy efficiency and Energy Audit.. its how we monitor energy consumption of certain buildings or system,.. we also learn briefly about sustainable energy.. it was a very brief and he was very open to all sorts of questions, he even gave advices on choosing the right course direction, companies to apply work for, etc..

I was supposed to go to the Building Control room in the evening, apparently there's a monthly meeting going on at 5, so, had to go to the meeting instead,.. the meeting basically announces that PTM is in re-constructing, and it is no longer called PTM.. the new name is Malaysia Green Technology Corporation (MGTC), or u can call it Green Tech Malaysia.. then, i had to go infront and introduce myself to the staffs. and then the meeting proceeds with Q&A session, and present giving to staffs who had birthdays during dat month..

Sunday, April 18, 2010

11th day

19 April 2010

Given a very good news from an intern colleague(fb can be accessed again!). without hesitate, access my fb, found my humhumm there, n fb chat..

Continue last friday's work of analyzing energy reduction from all projects,.. and record the data..finished it, not much work to do..
After lunch, revised on small hydroelectric power plant..this project utilizes the concept of run-off-river, and will generate a capacity of 10MW & connected directly to the TNB's distribution grid.
this project support the environmental friendly for green energy sustainable development,the development of rural electrification and it will be supporting more thn 70% of local technology content.
The project consists of turbine, generator, switchgear, transformer, shunt reactor, pipeline , and distribution cable.. it has the benefits to social, economic, and environment..

Thursday, April 15, 2010

10th day..

Came early in the morning, found out facebook has been block from PTM server..its a massive disaster for me tho.. another 10 weeks without fb here..
checked emails n blog..:>

At 9am, En Hishamudin invited me to join staff meeting downstairs,.. we waited for other staffs to come for about 15 minutes,.. in which ws filled by chatting with En Hishamudin.. After all the staffs involved arrive, the meeting began. basically the meeting is for the staffs to update their information on evaluation process, screening process, and problems with clients to En Hishamudin.. most of the clients give the same problems; incomplete and insufficient relevant information, unclear clarification, insufficient documents,etc.
After the staffs finish their updates to En Hishamudin, he asked me to assist him to be 'webmaster'(i'm an eng. student, really doesnt know much bout web design n stuffs), but he clarifies that all the designs will be done by the IT department, in which me and him will only propose on how to upgrade the webpage(GTFS.my).. :>
He then assigned me to analyze each projects 'Energy Reduction', and do a statistic about it..:>
At 3 pm, i went to a meeting between En Hishamudin with 2 design engineers; Mr Andrew and Mr Swaran Singh. they are both here to present their new development product, which can save power consumption in air-conditioning system, and hoping for PTM to acknowledge their technology. they prefer to finance the production of their product themselves, without the government financial assist..

After the meeting end, i approached Mr Swaran and asked him what design engineers do. he explained to me with a simple example, n its awesome. :>

p/s: cant wait to finish work today! n tmr saturday!! :0:>
:>

Wednesday, April 14, 2010

9th day

15 April 2010

as usual in the morning, online for a while, then start studying medical waste management project (CarbonatorTM).
The proposed carbonator is only an addition to the existing incinerator. the addition of it can reduce fossil fuel consumption, electricity consumption, emission of pollutant gases(CO2, S0x, CO, NOs, Dioxin, Furan) and it also cut costs.
This project is categorized under waste management sector as it involves waste reduction & waste to energy process(energy recovery).

After a few minutes of understanding the project, i started to verify the project outcome calculation; the carbonator can reduce the CO2 emission from 576.6kg/tonne to 199.6kg/tonne, which is a total reduction of 65.4%. it also reduces electricity consumption by 55.6%(466kW/tonne to 207kW/tonne) , and fuel consumption by 65.4% (208 L/tonne to 72 L/tonne).
After finish reviewing and studying the project, went down to see En Hanif, he showed me on how to do project outcome summary, and asked me to do it.
went upstairs, decided to do the summary after lunch.
right after lunch, kak ros asked me to update government contacts database.(tonnes of it)..
En. Hishamuddin asked me to do a data statistics, due is tomorrow morning..
(keen to finish it by today)

Tuesday, April 13, 2010

8th day

14th April 2010

another day at PTM(PTHN).. invited down to a presentation about PTM building to some Germany ambassadors,.. they sure are tall and big.. haih(us asians)..:>

the presentation was about greenTech Malaysia-Green Energy Office(GEO) Building,.. we waited for the ambassadors to arrive for about 15minutes.. and after they arrived, En. Azman(General Manager of PARM Division) greet them, and did some introduction about green technology in Malaysia, and then invited Mr Steve Anthony(EISD staff) to do the presentation..













i believe Mr Steve is involved in maintenance of the building with En Fendi.
the main objective is to achieve a sustainable office building of the future using Green Technology that is already available today..
the presentation was mainly description of the technology used in PTM building, which makes it the 1st GEO Building in Malaysia; sun-based lighting system, cooling system instead of air-conditioning, insulation, flat roof.. the cooling system is using poly ethylene crosslink(PEX), and the pipes were installed on floor slab, while the flat roof act as Energy generation system (photovoltaic)..
the presentation took about an hour and 15 minutes..:>

After that, went back to my workspace, and helped EISD staff fill in some envelopes with letters and Energy Awards magazines..:>
finished with dat, went down to EISD to submit project file i did yesterday to En Hanif.. he thanked me for the job done,.. and he then asked me to get another projects and study how the project outcome is calculated(i.e: amount of CO2 released, power generated, power required,etc) based on each project..

Monday, April 12, 2010

7th day..

(13th April 2010):>

came early in the morning.. can't stop chewing mentos..
helped kak ros with some filing stuffs..
read a project that was given to me yesterday by En Hanif..
Project: Palm oil based engine oil, desulfuriser & 2 stroke oil..:>

'Energy oil' is an environmental friendly substances which dissolved oil molecules to enable a more economical and healthy consumption of inflammable fuel.. 'energy oil' is a mixer to flammable fuel that allows the burning of fuel to be more economically effective and less polluting..
Normally in the burning process during flammable fuel consumption, the fuel only burn off 70%-75% of fuel to produce energy, the excess will dispersed through the exhaust pipe in the form of black smoke and soot or otherwise as one often realizedwhen the smell off fuel happens, resulting in lesser energy capacity..
So basically, 'energy oil' solve this problem by breaking up the molecule and hydrogen bond into smaller atom thus increasing the mass to create even and balance fuel substance which allow each atom to be easily expose to oxygen thus enable the fuel burning process to reach its highest efficiency, up to 98%. This results in higher energy capacity during fuel consumption, meaning better horse power and less wastage.:>
Here are some of the advantages of 'Energy Oil'.. fuel economy, increase engine power, cleanse injectors, spark plug, carburetors & fuel delivery system, ... extends engine life, keeps engine temperature cooler & noise reduction, easier in starting of engine, environmental friendly, and non-inflammable..:>

Sunday, April 11, 2010

2nd week at PTM

(12th April 2010)

Early in the morning, i asked for PTM organization stamp from kak zaharah, which is needed for our Industrial Logbook.. but she asked me to wait for the new 1 to come as PTM has change to Pusat Teknologi Hijau Negara(PTHN).. :>

after a while, i went down to GTFS department and asked Hanif if there is anything i could help him with.. then he decided to show me how the "screening process" is done, which is basically screening(green criteria) the projects proposed to PTM(or PTHN)..
he gave me a checklist and a project file.. so i went and study the projects upstairs in the EISD department.. :>

the project "Biodegradable Bag" has the goal of waste management & pollution reduction; to provide an environment friendly alternative to the use of plastic bag. The project is basically to produce Bioderadable bag with the use of "bio-resin" from tapioca starch.. unlike normal resin which is from petroleum, bio-resin is much more environmental friendly.. :>

the technology is from China, but manufacture in Malaysia; using Extruder machine, bag making machine pressing machine. :>

the total energy consumption of Biodegradable bag is the lowest, followed by earthsoul bags, PE bags, and paper bags.. low energy consumption means low Global Warming Potential(GWP).. so basically, biodegradable bag has the lowest GWP, while paper bags has the highest GWP.. :>

Thursday, April 8, 2010

5th day at PTM...

(9th April 2010)
nothing much of tasks given today..
went down to GTFS department in the morning, help filling database of projects proposed to PTM... *really getting familiarized with Microsoft Excel now:)*.. while filling in the database, i took a look at 2 or 3 projects,.. :>

one of them is about supply of renewable energy steam to a company.. it is basically to reduce growth rate of Green House Gases(GHG) through displacement of fossil fuel for power & steam generation by utilising palm oil residues& other biomasses from industrial, and also landscaping activities via gasification system..:>

The project is to build a biomass power plant, fueled with mainly empty fruit brunches(EFB) wood waste.., the main technology in the steam generation system originates from the Babcock & Wilcox biomass furnace conceptual design; advance combustion & emission control.. :>

currently, steam is produced by natural gas,.. however, the supply of natural gas is limited ,hence, alternative energy source is required.:>

the system use pyrolysis technique to convert energy content of the EFB into steam for power generation..:>

also read about some other projects, which use quite the same concept and technology..:>

just got a surprise call from an unknown number.. apparently, i know who was on the phone.. really helped clear things off my head a bit, and freshens me up:> :>..

Wednesday, April 7, 2010

4th day at ptm..

(8th April 2010)
reached ptm at 8.25, and kak ros assigned me to do GTFS database key in.. it was quite a LOAD of database to key in... worked it out for straight 2 hours,.. starting to feel stress a bit,:>
minutes later, an email came in from my doc, really took my mind off the workload, feels good again and ready to continue on other tasks:>

Kak Ros asked me to do a Gantt Chart dat En Hishamuddin requires.. the Gantt chart is basically project GTFS timeline.. she gave me a template of it in excel, and explained some stuff.. then, i went down to GTFS operation room to do the Gantt Chart with help from hafiz(semuit).. took about half an hour to get a perfect Gantt Chart to please En Hishamuddin.. then En hishamuddin asked me to submit the Gantt Chart to kak ros..:>

after lunch, went down to GTFS dep., help En Hanif do project screening... while filling in required data of the companies, I read some of the project explanation.. one of them is palm oil waste energy resources..:>
the project basically undertake the integrated management of solid&liquid waste in palm oil mill. The project can reduce CO2 emission from the capture & destruction of methane from POME(dun ask me wat tis is) & displacement of grid energy from energy generated by the technology..
read memorandum of companies, shareholders, and paid-up capital..:>

3rd day at PTM..

not much of activity today,..
juz went to a discussion and a meeting with a client..:>

the discussion was with GTFS, EISD staffs and Technical Expert(T.E) En. Ismail Abdullah..
En Ismail Abdullah have been working with Petronas for quite some years,.. and i realized he has such a knowledge about engineering.. especially chemical engineering.. he has such a strong field experience that i felt like saluting dat guy for his smartness.. never tot an engineer is so cool tho!.:>

The discussion was actually a preparation for the meeting with the clients.. they went through the project proposal and documentations, and pointed out the important things they want the client to clarify, such as the registration process, the efficiency of the system, and their output buyer....:>

After an hour of discussion, the client came.. the client was a new company, which appointed 2 guys to represent them.. one of them is an engineer(En. Ali) who has 25 years of experience with Petronas, and the other guy is a "Dato'". En Ali did the presentation on the technology he invented.. I really wish i can share it in here, but he clarified those informations are classified and cannot be recorded..
Basically their company propose a project about waste management... so its more related to chemical engineering, on how the substances were processed..
En Ali said that he got the idea of this project from an accident back when he was working for Petronas, and then he keeps doing experiment on converting plastic to energy..( Charcoal, Crude oil , and gas).. basically this technology has already been used worldwide, but En Ali invented a system that can cut down a bunch of cost, which he said is his secret,.. he wouldn't even reveal it to the PTM T.E, and C.O.O.;
probably juz protecting his technology from being stolen.. :>

from his presentation, he sure knows A LOT about chemical and chemistry,.. I felt soo overwhelmed by his knowledge..
Apparently, he was a Civil Engineering student... but i believe his 25 years experience with Petronas has made him the guy he is today.. :>

the meeting went well during En Ali's presentation, .. however, during the questions and answer from PTM's T.E, it was quite tense..
probably because they did not complete the checklist, and submit a complete registration,.. on the other hand, En Ali claimed that he has submitted it twice, and got the completion confirmation twice from PTM.. thats when things were quite tense.. eventually, when En Hishamuddin insists En Ali on doing it again, right there in the meeting room, the problem was found.. it has something to do with the GTFS' website.. En Ali filled the requirements in the web, monitored by T.E and En Hishamuddin,.. but the system still cannot get the registration..
They are considering a possibility of a hacker actually hacked into the website, and blocked other companies from registering, so that their company got the approval from PTM, as the protocol here is "1st come 1st serve" thingy..
after a while, they settled to an agreement, and the meeting ended..:>

En Ali did asked me once, "which university are u from?",. i said uniten,.. and he said,"UNITEN is a very good university"...
well.. its good to get an acknowledgment from such an awesome engineer as En Ali.. :>

Basically, today is the day that i actually learn A LOT about engineering stuff so far at PTM.. and believe it or not, its just from "1 meeting" and a discussion..:>


P/S: cant wait for saturday to come :>

Monday, April 5, 2010

PTM (PTHN)

2nd day at PTM
Discovered a LED table light at my desk.. I've underestimated the lighting power of LED all my life, but in reality, it's BRIGHT!
really innovative and energy efficient as LEDs requires less power than normal light.. :>
and, finally got my own laptop from PTM.. thx tho, hope this helps me to cope wif my boredness here :>

After about an hour of spending time enjoying the new lappy, finally kak zaharah called and asked me to do file labeling, and left me blur at my desk, without further explanation about it. After a while of blurness, i asked Fendi, a staff here on how to do it. He then talked to kak Zaharah, and i was given a "Labeling Template". Kak Zaharah then further explained to me how to write it.
Took about 15minutes to do the Green Township Project file label,
and then Fendi asked me to do another Project file labeling, which i took about 5 minutes.
*mastered the file labeling task* :>

After lunch, kak roslina asked me to accompany her to GTFS operation room and get client files. The files contains Project Evaluation, clarifications, original submissions from companies that intend to propose their project to PTM, and each files are like twice the size of Calculus textbook.
Took 2 hours to organize 10 companies' project files. These files are to be evaluated by PTM's Technical Experts later on. :>